ԻՐԱԶԵԿ ՔԱՂԱՔԱՑԻՆԵՐԻ ՄԻԱՎՈՐՈՒՄ•UNION OF INFORMED CITIZENS•СОЮЗ ИНФОРМИРОВАННЫХ ГРАЖДАН
Fact Investigation Platform
Նվիրաբերել
ՏԵՂԵԿԱՑՆԵԼ ԿԵՂԾԻՔԻ ՄԱՍԻՆ
Donate
REPORT DISINFORMATION
Поддержать
СООБЩИТЬ О ДЕЗИНФОРМАЦИИ
  • FACTOMETER
    • FALSE
    • MOSTLY FALSE
    • WITHOUT VERDICT
    • MOSTLY TRUE
    • TRUE
    • FAKE
    • MANIPULATIVE
  • Investigative
  • Data journalism
  • VIdeos
  • All
  • enen
    • Русский (ru)ру
    • Հայերեն (hy)հյ
No Result
View All Result
FIP.AM
  • FACTOMETER
    • FALSE
    • MOSTLY FALSE
    • WITHOUT VERDICT
    • MOSTLY TRUE
    • TRUE
    • FAKE
    • MANIPULATIVE
  • Investigative
  • Data journalism
  • VIdeos
  • All
  • enen
    • Русский (ru)ру
    • Հայերեն (hy)հյ
No Result
View All Result
ԻՐԱԶԵԿՔԱՂԱՔԱՑԻՆԵՐԻՄԻԱՎՈՐՈՒՄ
FIP.AM
No Result
View All Result
Donate
Home Manipulative

ANC Vice President’s Manipulative Claims on Amulsar Mine Contract

19:08, 11 Sep, 2019

MANIPULATIVE

In an interview on September 3, Levon Zurabyan noted that “the whole subsoil is given to Lydian for free” (32: 34-32: 42), which he described as corruption. In addition, according to the ANC Vice President, the contract “does not clearly state that only gold and silver can be removed”, it only mentions the quantity. (34։26-34:48)

In the end, Levon Zurabyan adds that the contract contains a paragraph that is straight out of a fantasy genre literature: “carry out reservation of newly discovered minerals in compliance with the procedure defined by the Government in case of not carrying out extraction thereof” (35:11-35:22)։ According to Zurabyan this is also a case of corruption.

The Fact Investigation Platform decided to compare the data and the allegations submitted by Levon Zurabyan with the points stipulated in the contract with Lydian.

About giving the whole subsoil to Lydian for “free”

According to paragraph 2.3 of the contract, “during the effectiveness of the Contract the profit received by the subsurface user as a result of the exploitation of the deposit shall be considered the property thereof.”

At first glance it might seem that there is a corruption factor underlying this wording, but the Lydian contract is drafted according to the “Exemplary Form of the Subsoil Mning Contract for the Extraction of Mineral Resources” adopted by the Government of the Republic of Armenia in 2012.

Therefore, as it is conceivable that the profit gained from the use of the mine becomes the property of the subsoil user, therefore it is simply a manipulation to consider this point of the contract contradictory or qualify it as corruption.

In addition, the above-mentioned exemplar sets out state duties and charges for subsoil usage, as well the charges for the monitoring aimed to ensure the safety and health of the population, which are also found in Paragraph 2 and 3 of Appendix 1 in the agreement with Lydian.

Part 1 of Annex No 1 deals with financial proposals for the extraction of minerals by the user. Accordingly, the total amount of investments for financial proposals amounts to 75,180,000,000 AMD. That is to say, Lydian must implement a certain investment program to operate the Amulsar mine, the state does not make a free donation.

About the Gold and the Silver

In the interview, Levon Zurabyan claimed that the contract does not specify that as a result of the mine, only gold and silver can be mined.

Paragraph 2.1 of the contract, however, stipulates that the Authorized Body (Ministry of Energy Infrastructures and Natural Resources of the Republic of Armenia) provides the Amulsar Gold Mine to the subsoil user for mineral wealth extraction for temporary disposal and utilization  of 2600,0 thousand tonne of Mining Resources annually.

Godl- 52664 kg,

Silver – 210.51 ton

Gold 52664 kg  Silver – 210.51 ton

The types of mineral resources (subtypes) 

On the extraction of newly discovered minerals extraction

Levon Zurabyan found the paragraph on extraction of newly discovered minerals strange and described it as “taken from the genre of fantasy”.In accordance with paragraphs 3.4.15 and 3.4.16 of the contract, the subsoil user shall:

“Inform the Authorized body about discovery of accumulation of minerals not specified in the contract on mineral extraction within 14 days following the discovery thereof; carry out reservation of newly discovered minerals in compliance with the procedure defined by the Government in case of not carrying out extraction thereof”

It is incomprehensible why Levon Zurabyan views this point as a fantasy genre and presents it as a corruption risk, as the same requirement is laid down in paragraphs 14-15 of Article 59 (2) of the Code of Subsoil.

Thus, the problematic paragraphs of the contract between Lydian Armenia CJSC and Ministry of Energy Infrastructures and Natural Resources of the Republic of Armenia presented by Levon Zurabyan during the Inside Politics program are not problematic at all, but are defined by the RA Legislation and legal regulations. It is another matter that the Legislation of the Republic of Armenia is not perfect and contains corruption risks.

Gayane Gasoyan

[easy-social-share buttons="facebook,twitter,vk,telegram" counters=1 style="icon" point_type="simple"]

Related Posts

Fake news about French nuclear waste sparks Azerbaijani campaign: Courrier France 24 and the Doppelgänger method
Սխալ

Fake news about French nuclear waste sparks Azerbaijani campaign: Courrier France 24 and the Doppelgänger method

14:05, 2 Jul, 2025

On June 25, the French website courrierfrance24.fr published an article titled “Orano secretly exports nuclear fuel waste to Armenia to...

BBC Armenian journalist made factual errors and omissions
Սխալ

BBC Armenian journalist made factual errors and omissions

11:21, 30 Jun, 2025

Grigor Atanesyan, an Armenian journalist for the BBC Russian Service, gave an interview to the BBC itself and made a...

Euronews misrepresents the squabble between Pashinyan and the clergyman making some corrections hours later
Սխալ

Euronews misrepresents the squabble between Pashinyan and the clergyman making some corrections hours later

10:43, 27 Jun, 2025

Euronews, an international news broadcaster in Europe, covered the domestic political situation in Armenia on June 26, misrepresented an episode...

“The ENA is being taken away from Karapetyan to be handed over to the Turks” Kremlin propagandist makes false claim
Սխալ

“The ENA is being taken away from Karapetyan to be handed over to the Turks” Kremlin propagandist makes false claim

11:42, 19 Jun, 2025

A number of Armenian media outlets are actively circulating an article by Kremlin propagandist Andrey Areshev about the upcoming visit...

Related Posts

Fake news about French nuclear waste sparks Azerbaijani campaign: Courrier France 24 and the Doppelgänger method
Սխալ

Fake news about French nuclear waste sparks Azerbaijani campaign: Courrier France 24 and the Doppelgänger method

14:05, 2 Jul, 2025

On June 25, the French website courrierfrance24.fr published an article titled “Orano secretly exports nuclear fuel waste to Armenia to...

BBC Armenian journalist made factual errors and omissions
Սխալ

BBC Armenian journalist made factual errors and omissions

11:21, 30 Jun, 2025

Grigor Atanesyan, an Armenian journalist for the BBC Russian Service, gave an interview to the BBC itself and made a...

Euronews misrepresents the squabble between Pashinyan and the clergyman making some corrections hours later
Սխալ

Euronews misrepresents the squabble between Pashinyan and the clergyman making some corrections hours later

10:43, 27 Jun, 2025

Euronews, an international news broadcaster in Europe, covered the domestic political situation in Armenia on June 26, misrepresented an episode...

“The ENA is being taken away from Karapetyan to be handed over to the Turks” Kremlin propagandist makes false claim
Սխալ

“The ENA is being taken away from Karapetyan to be handed over to the Turks” Kremlin propagandist makes false claim

11:42, 19 Jun, 2025

A number of Armenian media outlets are actively circulating an article by Kremlin propagandist Andrey Areshev about the upcoming visit...

  • About Us
  • Methodology
  • Corrections and Complaints policy
  • Contact us

Partners

Membership

IFCN Signatory Badge

    Copyright © 2025 Union of Informed Citizens

    No Result
    View All Result
    • FACTOMETER
      • FALSE
      • MOSTLY FALSE
      • WITHOUT VERDICT
      • MOSTLY TRUE
      • TRUE
      • FAKE
      • MANIPULATIVE
    • Investigative
    • Data journalism
    • VIdeos
    • All
    • Հայերեն (hy)
    • English (en)
    • Русский (ru)

    Copyright © 2025 Union of Informed Citizens